Loading...

Summary

BitWare Group Limited UK is a technological group of 45 world's best engineers and 5 laboratories focused on IoT, Blockchain, AI and Machine Learning.

Mineberg - is a trademark of BitWare Group that will provide own-production, low-margin, life-time dedicated Bitcoin mining capacities world-wide.

Own manufacture and maintain process allows to reduce capital and operational expenses, providing supercomputer clusters' best for cryptocurrency networks service.

Mineberg Immersion Mining Center's minimal hosting rate is $0.02 per kWh. We offer 1 TH/s for 50$, providing lowest entry threshold on the market.

Project’s fund constantly increases total computing power and distributes it among the coinholders, ensuring a guaranteed level of bitcoin production.

Coinholders are able to convert Bitcoin to Fiat through our own Bitcoin exchange.

ICO Stage #1 running until December 14, 2018

500K SOFTCAP
4M MIDDLECAP
8M HARDCAP

ICO Stage #1 (30% OFF) Description

  • 1 BERG = 0.7 USD
  • Total coins suply for Pre-ICO = 714,286 BERG
  • $50 = 1 TH/s of Mineberg Immersion Mining Center's capacity.
  • Possibility to resell BERG freely through the Mineberg Wallet.
  • Capacity activation - 1 month after the ICO end.
  • Coins can be distributed to any hashrate equivalent needed.

Buy Tokens

Introduction

Introduction

Blockchain Explorer

Mobile Wallet

Will be soon...

Mineberg review

The key value of Mineberg is client-focused approach, thus we will gladly fulfill all the individual requests of our clients. Highly trained mining centers specialists provide equipment installation services for no additional cost. Mineberg center’s minimal hosting rate is $0.02 per kWh. In contrast with the majority of competitors, Mineberg mining center offers lowest entry threshold of 1TH/s for Bitcoin mining.

Mineberg clients are free to purchase Bitcoin or altcoin mining equipment on the company’s website. New-generation miners combine low power consumption with increased hashrate. The prices as well as technical characteristics are updated on a regular basis; users can get acquainted with the relevant information on the company’s website: https://mineberg.com/

Project’s ICO objective - industrial mining equipment production and module immersion data centers construction. Mineberg project’s objective is to profit from building and upgrading data centers and renting them to the public. The project resources are sophisticated computing equipment as well as the team of highly qualified specialists from Bitware Group Limited UK.

Mineberg BTC Miner

Mineberg BTC Miner
160 TH/s miner module for SHA256 algorithm processing based on 14nm ASIC chips

Mineberg HPC Server

Mineberg HPC Server
HPC server module for altcoins mining, big data, machine learning and video rendering

Mineberg BTC 7nm ASIC

Mineberg BTC 7nm ASIC
A new generation TSMC 7nm full custom ASIC for SHA256 algorithm with ASICBoost

Mineberg Immersion Liquid

Mineberg Immersion Liquid
Two-phase immersion liquid for equipment cooling and hashing performance acceleration

Mineberg Mining Center

We develop and build data centers for cryptocurrency processing and high computing calculations. Two-Phase Immersion Cooling system allows to increase operating equipment’s total performance by 50%. Project’s uniqueness consists in the use of own hardware and software technologies as well as the risk management system and automatic income-to-fiat conversion.

Mineberg Energy

Bitware Group provides the opportunity to produce cheap electricity by using associated petroleum gas in the places where such production is considered unprofitable. Preserving the environment, Mineberg uses the excess mining heat for agriculture purposes. With this approach the costs of growing fruits and vegetables in extreme climatic conditions will become cheaper by 80%.

CEO

Brent Beeman

Brent Beeman
IR Manager

Dong Wang

Dong Wang
PR Manager

Viktor Arockiaraj

Viktor Arockiaraj
Chief Hardware Developer

Alexander Sokolov

Alexander Sokolov
Chief software developer

Dr. Santhanam Srinivasan

Dr. Santhanam Srinivasan
CTO

Levi Itzhak

Levi Itzhak

Technological Team

Bitware's technological group combines 4 industrial laboratories and more than 45 people.

We have extensive experience in computing equipment developing, prototyping, manufacturing and packaging, prodivding solutions with topological norms from 250 to 7 nm inclusive.

Our company has direct access to the TSMC factory (Taiwan) and to the largest factory in South Korea for printed circuit boards and high computing calculations equipment automatic production.

ICO Overview

Project’s ICO objective - industrial mining equipment production and module immersion data centers construction.

Transactions will be easily tracked via Mineberg blockchain to guarantee high level of transparency.

Retail and wholesale coinholders are free of rental, electricity and operational fees, reducing total hosting cost, making mining with Mineberg the best choice on the market.

Participants can utilize coins only in case they are on the website’s module balance. Purchased equipment automatically displayes on the balance and correlate with the user’s coins.

Before coin activation, participants will receive contributions from project’s already activated equipment.

When mining is activated on the website, users will be grouped into the mining pools, where Mineberg capacities are distributed between them. Wholesale users will be able to activate mobile or stationary Data Centers supply and deploy them on their territory.

ICO Summary

  • Mineberg participants increases the income by reduced hosting cost with the access to hi-end technologies and extremely low cost mining capacities
  • $50 equivalent allows to use 1TH/ s of Mineberg’s mining capacity for 50 years in the Bitcoin network without any rent fees
  • Presale will be started on November 1, 2018
  • The main ICO stage will take place in December 2018 – January 2019
  • We accept BTC and credit card payments according to the rate at the day of purchase
  • The threshold is active for both presale and main ICO stage
  • It is possible to buy BERG coins only at the dates of presale and main ICO stage

Business model

First stage:
Production of the Miners

Production of Mineberg 14nm BTC Immersion Miner - (Industrialisation and machine supply).

Production of HPC equipment Mineberg HPC Server, Stratix 10 FPGA+HBM2 Immersion machine for HPC and AI - (Industrialisation and machine supply).

Mineberg 20MW GreenHouse (Office, Gas Power Stations, Mining equipment, GreenHouse).

Results of the 1st stage: 2 type of low-margin solutions for industrial mining BTC Miners and HPC Servers for High-Performance Computing are ready.

The total capacity of the immersion center, subject to raising funds in the amount of $ 8,000,000 (Hardcap), will be 20 MW. The miners’ supply time is 1 month starting from the end of ICO.

Immersion center building schedule:

  • Softcap - 1 module of Mineberg IC with total 1 MWt capacity will be launched
  • Midcap - 10 modules of Mineberg IC with total 10 MWt capacity will be launched
  • Hardcap - 20 modules of Mineberg GreenHouse with total 20 MWt capacity will be launched.

Second stage:
ASIC development and production

The release of a chip for Bitcoin mining - 7nm BTC ASIC (IC, IP, TSMC lithography and prototype);

Release of co-processor for HPC acceleration ASIC+HBM2 (System in Package rototype - SiP);

Mass production of HPC co-processors and mining chips for 7nm BTC ASIC.

The results of the second stage: ASIC microcircuit for industrial mining 7nm BTC and a coprocessor to accelerate machine learning and robotic systems.

Additional emission
In the process of developing the project, Mineberg will have new capacities that will be reflected through the additional release of a batch of coins and placing them on the exchange. In total, after the implementation of three stages of additional emission, the total capacity of the immersion center will be 170 MW.

  • $10M - 25 Mineberg modules with a total capacity of 25 MW.
  • $20M - 50 Mineberg GreenHouse modules with a total capacity of 50 MW.
  • $35M - 80 Mineberg GreenHouse modules with a total capacity of 80 MW

ICO Summary

Symbol BERG
Total emission of the coins 100000000
Softcap $500,000
Midcap $4,000,000
Hardcap $8,000,000
First batch of coins (Pre-ICO) 714,286
Price for the first batch of coins (Pre-ICO) $0.7
Second batch of coins (ICO) 9,375,000
Price for the second batch of coins (ICO) $0.8
The first batch of coins to be placed on the stock exchange (after ICO) 10,000,000
The starting exchange price for the first batch of coins (after ICO) $1
The second batch of coins to be placed on the stock exchange 20,000,000
Third batch of coins to be placed on the stock exchange 35,000,000
Website: www.mineberg.io
Accepted manner of payment: Bitcoin ("BTC"), Credit cards
Presale: November 2018. A possibility to buy BERG coins for the equivalent of $0.7 – $0.8 at the moment of purchase
Main ICO stage: December 2018 - January 2019. The coin price is equivalent of $1 at the moment of purchase
Exchange listing Coin will be listed on the crypto exchanges right after the ICO end.
TSMC
TSMC
INOMIZE
INOMIZE
IMEC
IMEC
ALCHIP
ALCHIP
NAUTECH
NAUTECH
Institute of Combustion Problems
Institute of Combustion Problems
ASE GROUP
ASE GROUP
XAPO
XAPO
Institute of Software Systems
Institute of Software Systems
MOORTEC
MOORTEC
Steep City LTD
Steep City LTD
MCS Group
MCS Group

Have a question?

Contact Details

  • London, UK:
    44 20 3287 37 70
  • Israel, Jerusalem:
    972 2560 9552
  • China, Hong Kong:
    852 5906 3183
  • Russia, Moscow:
    7 499 350 3414

www.mineberg.com